Questions? +1 (202) 335-3939 Login
Trusted News Since 1995
A service for energy industry professionals · Tuesday, April 16, 2024 · 704,073,137 Articles · 3+ Million Readers

TransCanada Places Topolobampo Pipeline Into Service

MEXICO CITY, July 16, 2018 (GLOBE NEWSWIRE) -- Media Advisory – TransCanada Corporation (TSX:TRP) (NYSE:TRP) (TransCanada) today announced its Topolobampo Pipeline project has been placed into service in northern Mexico, providing capacity for 670 million cubic feet of natural gas per day to markets in the states of Chihuahua and Sinaloa. The project represents an investment of approximately US$1.2 billion and provides the upstream interconnection with the company’s Mazatlan Pipeline.

The project involved the construction of approximately 560 kilometres (348 miles) of 30-inch diameter pipeline from El Encino, near the city of Chihuahua, to Topolobampo, near the city of Los Mochis, Sinaloa. Combined, the Topolobampo and Mazatlan pipelines form a system that adds over 870 kilometres (540 miles) of critical energy infrastructure that will play a fundamental role in providing natural gas to power plants, industrial and urban markets for the economic development of the northwest region of Mexico.

"The completion of the Topolobampo and Mazatlan pipeline system is an important milestone for TransCanada as we continue to expand our portfolio to deliver natural gas to serve Mexico’s electric generation needs. We are developing the infrastructure to feed new power plants and convert existing fuel oil and diesel power plants, thereby reducing both the cost of electricity and greenhouse gas emissions,” said Robert Jones, president, TransCanada Mexico. "We are proud of the way we overcame technical challenges and completed this difficult project safely."

The construction of the Topolobampo Pipeline presented some of the most demanding construction challenges in the country given the geography along the route, including crossing the Tarahumara mountain range near the Copper Canyon in the state of Chihuahua. TransCanada used innovative techniques such as a raised bore to cross the extreme steep cliff faces and air cranes for transporting pipes to remote locations along the route.

Over the course of construction, the project employed nearly 3,500 employees and contractors and achieved over 10 million man-hours without a lost-time incident. Throughout the course of the project, TransCanada worked closely with landowners and local officials to ensure they were an important part of the development and construction process. This project was one of the first projects in Mexico to include federal government-led Indigenous consultations with impacted communities.

TransCanada’s presence in Mexico dates back to the mid-1990s with the construction of the first two privately owned pipelines in the country. The company’s natural gas pipelines in Mexico – either in operation or under construction – now total over 3,190 kilometres (1,982 miles) with a capacity of 7.1 billion cubic feet per day and an investment of approximately US$5.6 billion.

With more than 65 years' experience, TransCanada is a leader in the responsible development and reliable operation of North American energy infrastructure including natural gas and liquids pipelines, power generation and gas storage facilities. TransCanada operates one of the largest natural gas transmission networks that extends more than 91,900 kilometres (57,100 miles), tapping into virtually all major gas supply basins in North America. TransCanada is a leading provider of gas storage and related services with 653 billion cubic feet of storage capacity. A large independent power producer, TransCanada currently owns or has interests in approximately 6,100 megawatts of power generation in Canada and the United States. TransCanada is also the developer and operator of one of North America’s leading liquids pipeline systems that extends approximately 4,900 kilometres (3,000 miles), connecting growing continental oil supplies to key markets and refineries. TransCanada’s common shares trade on the Toronto and New York stock exchanges under the symbol TRP. Visit TransCanada.com to learn more, or connect with us on social media.

FORWARD-LOOKING INFORMATION

This publication contains certain information that is forward-looking and is subject to important risks and uncertainties (such statements are usually accompanied by words such as "anticipate", "expect", "believe", "may", "will", "should", "estimate", "intend" or other similar words). Forward-looking statements in this document are intended to provide TransCanada security holders and potential investors with information regarding TransCanada and its subsidiaries, including management's assessment of TransCanada's and its subsidiaries' future plans and financial outlook. All forward-looking statements reflect TransCanada's beliefs and assumptions based on information available at the time the statements were made and as such are not guarantees of future performance. Readers are cautioned not to place undue reliance on this forward-looking information, which is given as of the date it is expressed in this news release, and not to use future-oriented information or financial outlooks for anything other than their intended purpose. TransCanada undertakes no obligation to update or revise any forward-looking information except as required by law. For additional information on the assumptions made, and the risks and uncertainties which could cause actual results to differ from the anticipated results, refer to the Quarterly Report to Shareholders dated April 26, 2018 and 2017 Annual Report filed under TransCanada's profile on SEDAR at www.sedar.com and with the U.S. Securities and Exchange Commission at www.sec.gov.  

Media Inquiries:
Grady Semmens
403.920.7859 or 800.608.7859

TransCanada Investor & Analyst Inquiries:
David Moneta / Duane Alexander
403.920.7911 or 800.361.6522

Primary Logo

Powered by EIN News
Distribution channels: Energy Industry


EIN Presswire does not exercise editorial control over third-party content provided, uploaded, published, or distributed by users of EIN Presswire. We are a distributor, not a publisher, of 3rd party content. Such content may contain the views, opinions, statements, offers, and other material of the respective users, suppliers, participants, or authors.

Submit your press release